Operating journeys

Test pages for the work people will do on the ground: the year, the day plan, a round, work orders, a procedure, the kit, the plane, and a processing day. Not wired to the system, so we can see the flow and find what is missing.

Sample data. A made-up station with the four systems, used to test the flow. Nothing here is a real place, person or record, and nothing is saved.

The working year
Built, stranded1Designed1Decided, not built2Missing4
A round, on the phone
Live2Built, refused1Designed2Missing3
Work orders
Live4Designed4Missing2
The day plan
Built, refused1Designed2Missing3
Procedure and sign-off
Built, refused3Decided, not built1Missing4
The kit room
Live1Decided, not built2Missing4
The plane
Live2Designed1Decided, not built1Missing4
Processing day
Live1Built, refused3Designed3Decided, not built1Missing1

Where the system stands for all of this

64 elements across the 8 pages, each checked against production on 18 Oct 2026. Open “What this page needs” at the foot of any page for the detail.

10
Live
In production and reachable in today’s app.
1
Built, stranded
Built in production, but only on the classic site tabs the current app never opens.
8
Built, refused
Code exists, but it writes keys the registry does not hold, so strict mode refuses the write.
13
Designed
Named in production’s taxonomy, plan or an open issue; not registered or built.
7
Decided, not built
Curtis has settled the direction; nothing is built yet.
25
Missing
No home in production yet.

The moves that open the most

  1. 1Register one rule per schedule and work out occurrences on the serverplan step 3The working yearA round, on the phoneThe kit room
  2. 2A home for work on the web, from the Work placeholdershell spineWork ordersThe day planThe working year
  3. 3Register the credential keys, drop the name, sign with a keyD-D · plan step 5Procedure and sign-offA round, on the phoneThe day planWork ordersProcessing day
  4. 4The “sent from” link#838A round, on the phoneWork orders
  5. 5Sign-off by every party, Approved locks#848Work ordersProcessing day
  6. 6One event form for anything that moves#882Processing dayA round, on the phone
  7. 7Kit condition and check records; a form type for machineryinventoryThe kit roomThe planeWork orders
  8. 8Rooms, true scale inside a building, positions that persiststrand P6–P7 · plan 3.3, 3.5The planeThe kit room

The journeys these pages test

A family member covering the weed round

First week of the wet: the round is due, have they signed the brushcutter, what did the last round find.

The land and machines lead, on processing day

Noni from block C1 becomes powder; the batch holds where it grew, what went in and out, and its checks.

A buyer before signing for the season

Opens the batch the station shared: the block, the certificate, a pass or fail per check, nothing else.

The business lead before the wet

Can the station carry a cyclone and a loan at once: cover, the drill, the checks overdue.

The next generation, years from now

Who signed which procedure, every change with its history, where each number came from.

The nursery and events lead at a farm day

Everyone inducted before the rows, the head count kept, the photos waiting for consent.

Anyone fixing the shed

The cool room is warm: what feeds it, what else hangs off that board, what work is already open.

Seven structures under every journey

Place
Biome → organisation → place → lot → block → row → tree; and building → room → kit.
The planeThe kit room
Time
Line → schedule (one rule) → occurrences (worked out) → work order → record → history.
The working yearThe day planA round, on the phoneWork orders
People
Role → who a line may be handed to → procedure → signed competency (a key, not a name).
Procedure and sign-offThe day planA round, on the phoneThe working year
Kit
Register → condition and checks → the lines that keep it → where it sits → what it connects to.
The kit roomThe plane
Product
Block → harvest → batch → checks → dispatch: one event form for anything that moves.
Processing day
Proof
Outcome → sign-off by every party → locked; evidence cited by checksum.
Work ordersProcessing day
Network
Who may see what: the station decides, per reader, per field.
Processing day

The thinking behind these pages, the options and the open questions: docs/proposals/2026-10-18-operating-journeys-ux-deep-dive.md in the production repo. Leave notes on any page with the lab’s annotate button; they reach the feedback inbox.